Samsung Heat Pump Product Overview:

The Mono outdoor unit contains the hydronic unit and can be installed by a plumber. The unit is connected to an indoor domestic hot water tank.
EHS Mono R32 Gen-6

The Mono HT Quiet solution is similar to our Mono solution but can deliver a high water temperature at low noise levels. Making it ideal for the residential renovation market.
EHS Mono HT Quiet

The Mono R290 uses R290 as a refrigerant, which has a lower Global Warming Potential (GWP=3). It is also available in a boarder range of capacities fitting with varying project requirements – 5, 8, 12, and 16kW.
EHS Mono R290 Gen-7

Manufacturer Brochures

ECO Heating System

EHS Mono R290

Installation Documents and Guides

Samsung Scope of Works
All equipment supplied by us will come with all the necessary manufacturer’s instructions, but we have put together this handy, simplified on-site guide to follow with all the information required to complete the first and second fix plumbing and electrical installations.
Download – Integrated

Download – Non Integrated

URS Samsung installation guides
For the URS “open loop system” design installers MUST adhere to the URS installation guidelines rather than the manufacturer’s installation manual that accompanies the unit.

Mono R32 Gen-6 & Mono HT Quiet:
Pipe Schematics – Download
Wiring Schematics – Download
Commissioning & User Guide – Download

Mono R290 Gen-7 Non Integrated:
Pipe Schematics – Download
Wiring Schematics – Download
Commissioning & User Guide – Download

Mono R290 Gen-7 Integrated:
Pipe Schematics – Download
Wiring Schematics – Download
Commissioning & User Guide – Download

Pre-commissioning Checklist
Download

Warranties
Samsung offers a 2-year standard warranty on all heat pumps. If URS are not completing MCS certification on behalf of the installer then they must complete the training modules to benefit from being able to offer a 7 year warranty on Samsung EHS Heat Pumps.

Installer training module Samsung training modules info sheet – download

Samsung portal – https://partnerhub.samsung.com/climate

How to sign up to partner portal – https://youtu.be/b7E1-5Wjjgs

How to access e-learning training modules – https://youtu.be/utiEqn1L-8g

MCS Documentation

If the installer orders URS MCS Umbrella Scheme Service, we will require the following for us to process £7500 BUS Grant, please provide them as soon as possible to avoid any delays. Email to Bus@ultimaterenewables.com

Prior to installation
Subcontractor agreement form – Download

Post installation
Within 10 days of completion of the installation, we will require prior to arranging commissioning and sign off visit, the following: 
Pre-commissioning check list – Download 

Extended warranty and Commissioning sheet – Download

Other useful documentation and leaflets