Clivet Documents and Data Sheets

Clivet Heat Pump Product Overview:

Edge EVO 2.0 –  is the solution designed for upgrading old generators without having to alter the system. The system is in fact extremely versatile and able to adapt to whatever already exists: it simply replaces the generator that produces Heating and Domestic Hot Water, improving comfort and efficiency, as well as ensuring peace of mind
Edge EVO 2.0 R32

Manufacturer Brochures

Edge EVO 2.0

Installation Documents and Guides

Clivet Scope of Works
All equipment supplied by us will come with all the necessary manufacturer’s instructions, but we have put together this handy, simplified on-site guide to follow with all the information required to complete the first and second fix plumbing and electrical installations.
Download

URS Clivet installation guides
For the URS “open loop system” design installers MUST adhere to the URS installation guidelines rather than the manufacturer’s installation manual that accompanies the unit.

Clivet Edge EVO 2.0 R32 Single Phase:
Pipe Schematics – Download
Wiring Schematics – Download
Commissioning & User Guide – Download

Clivet Edge EVO 2.0 R32 Three Phase:
Pipe Schematics – Download
Wiring Schematics – Download
Commissioning & User Guide – Download

Pre-commissioning Checklist
Download

Warranties
Clivet offers a 1-year standard warranty on all heat pumps. If URS are not completing MCS certification on behalf of the installer then they must complete this form and send it to info@ultimaterenewables.com to being able to offer a 7 year warranty on Clivet Heat Pumps.

Clivet commissioning and warranty form – Download
Clivet Heat Pump Warranty Terms – Download

MCS Documentation

If the installer orders URS MCS Umbrella Scheme Service, we will require the following for us to process £7500 BUS Grant, please provide them as soon as possible to avoid any delays. Email to Bus@ultimaterenewables.com

Prior to installation
Subcontractor agreement form – Download

Post installation
Within 10 days of completion of the installation, we will require prior to arranging commissioning and sign off visit, the following: 
Pre-commissioning check list – Download 

Clivet commissioning and warranty form – Download

Other useful documentation and leaflets